Setting out 1) The Contractor shall establish working bench marks tied with the Reference bench mark in the area soon after taking possession of the site. The Reference bench mark for the area shall be as indicated in the Contract Documents and…
In addition to the conditions indicated in the Contract Documents, the following conditions regarding use of equipment in works shall be satisfied: a) The Contractor shall be required to give a trial run of the equipment for establishing their capabi…
Introduction for Morth specifications These specifications shall apply to all such road and bridge works as are required to be executed under the Contract or otherwise directed by the Engineer-in-Charge (hereinafter referred to as the Engineer). In …