What is revised estimate in building/Reverse estimate in civil engineering

Revised Estimate


Revised Estimate


The revised estimate is the estimate which includes revised quantities or specifications and Rates.

The conditions for the preparation of Revised estimates are

1. When the area or measurements of the approved plan changes

2.When the specification of material of method of construction changes

3.When the rates of the material, labour changes over and above 10%

4. When the location of the work changes