We've compiled a list of frequently asked Civil Engineering interview questions and answers that you might be asked during your Civil Engineer job interview. Depending on their experience and other factors, candidates will most likely be asked basic to advanced level Civil Engineering interview questions.
The list below includes all of the most important Civil Engineer interview questions for both new and experienced professionals. This guide to common Civil Engineering interview questions will help you ace the interview and land your dream job.
1) What are the responsibilities of a construction manager?
The responsibilities of a construction manager are
Potential risk factors for worker on the construction site
OSHA stands for Occupational Safety and Health Act; its motive is to fulfill the health and safety requirement of employees and workers. It is a standard for health and safety that is followed by every industrial segment and corporate offices throughout U.S.A.
4) Mention what are the composition of a landfill?
For secure landfill, there are four critical elements
- The bottom liner
6) List out some of the software used in the construction sector to estimate cost and monitoring expenses?
7) What is reinforced concrete?
Reinforced concrete have steels bars or mesh in them, which gives extra strength to the construction.
Three main types of foundation are
Hybrid Foundation is usually used for high rise building, it contains both soil supported mat and piles. This type of foundation is helpful in reducing the amount of the settlement.
11) Explain what is floating slab foundation?
A floating concrete foundation is a type of mat foundation that consists of the hollow mat formed by a grid of thick reinforced concrete walls between two thick reinforced concrete slabs.
Flashing is an extended construction that is done to seal and protects joints in a building from water penetration. Flashing is installed at the intersecting roofs, walls and parapets.
Various inspections during the construction includes
Some of the checking done on the exterior of the construction is
Alternate bid is the amount stated in the bid to be deducted or added from the base bid amount. Alternate bid is proposed when there is a use of alternate materials or methods of construction.
Change order request is a written document issued or given by the owner, requesting an adjustment to the contract sum or an extension of the contract time. Usually, it is issued by the architect or owners representative.
A construction cost covers material, labor, equipment and services, contractor’s overhead and profit and other direct construction costs. While, it does not cover compensation paid to the architect, consultant or engineers, cost of the land and other cost that is owner’s responsibility.
Critical Path Method is strategy and method of representing the respective tasks and activities involved in the construction through a symbolic diagram.
Demising wall is used for the boundary that separates your land or house from neighbor’s house
27) Explain what is 1/8 on the architect ruler denotes?
1/8 on the ruler is infact a scale that converts 1/8 inch on to the drawing to 1 foot. It would represent a drawing with a scale of 1/8”= 1 foot.
28) List out some of the software program that can be useful for architect?
• AutoCAD
• Revit
• 3DS Max
• Sketchup
• Photoshop
• Adobe creative suites
• Microsoft office
• Digital Media
29) Explain what are the skills required to become an architect?